Jul 16 2024finish framingthe addition has been framed/ready for window install and electric/plumbing/HVAC rough-in/2024/07/16/66528/
Jun 05 2024fill rockuse #57 rock to fill the space inside the block foundation for the concrete slab to be poured on
Jun 03 2024ramp frame filled with rockthe wood form is filled with rock so the equipment basically has a road to the site